技术文栏 - 技术资料 - 桥梁工程 - 浏览文章 - 预应力筋伸长量计算
预应力筋伸长量计算
http://17grow.com 2006-2-18 16:23:00
G205宁芜公路养护改善工程B2标江宁镇大桥
预应力钢绞线张拉程序(中跨梁)

一、张拉控制应力计算
N1:δK=0.75Ryb×Ap总×1.01=0.75×1860×3×140×1.01=591.76KN
N2:δK=0.75Ryb×Ap总×1.01=0.75×1860×4×140×1.01=789.01KN
N3:δK=0.75Ryb×Ap总×1.01=0.75×1860×4×140×1.01=789.01KN
(1.01为锚板应力损耗系数)

二、张拉程序
             0   →   10%δK   →   20%δK   →   100%δK(持荷2min锚固)
N1:        0   →   59.18KN  →   118.35KN  →   591.76KN(持荷2min锚固)
N2:        0   →   78.90KN  →   157.80KN  →   789.01KN(持荷2min锚固)
N3:        0   →   78.90KN  →   157.80KN  →   789.01KN(持荷2min锚固)

三、油表读数

N1:
1、1#千斤顶   76#油表
0   →   59.18KN  →   118.35KN  →   591.76KN
0   →   2.37MPa  →    4.43MPa  →   20.96MPa

2、0266#千斤顶   40387#油表
0   →   59.18KN  →   118.35KN  →   591.76KN
0   →   1.18MPa  →    2.55MPa  →   19.21MPa

N2:
1、1#千斤顶   76#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   3.06MPa  →    5.81MPa  →   27.84MPa

2、0266#千斤顶   40387#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   1.58MPa  →    3.73MPa  →   25.67MPa

N3:
1、1#千斤顶   76#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   3.06MPa  →    5.81MPa  →   27.84MPa

2、0266#千斤顶   40387#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   1.58MPa  →    3.73MPa  →   25.67MPa

G205宁芜公路养护改善工程B2标江宁镇大桥
预应力钢绞线伸长量计算

中跨梁:
N1        X(m)        25.42        含千斤顶工作长度每端0.58m
N2                25.48        
N3                25.17        
N1        θ=L弧/R        0.12218        
N2                0.12218        
N3                0.02443        
N1        KX+μθ        0.0882402        K=0.00251 μ=0.2
N2                0.0883908        
N3                0.0680636        
N1        1-e-(KX+μθ)        0.084459062        
N2                0.084596932        
N3                0.065798963        
N1        1-e-(KX+μθ)KX+μθ        0.957149485        
N2                0.957078474        
N3                0.966727337        
N1        P×[1-e-(KX+μθ)]KX+μθ        560.79        P=585.90KN
N2                747.67        P=781.20KN
N3                755.21        P=781.20KN
N1             Pp×X     As×Ep        17.406        As=140mm2Ep=1.95×105Mpa
N2                17.446        
N3                17.407        





G205宁芜公路养护改善工程B2标江宁镇大桥
预应力钢绞线张拉程序(边跨梁)

一、张拉控制应力计算
N1:δK=0.75Ryb×Ap总×1.01=0.75×1860×4×140×1.01=789.01KN
N2:δK=0.75Ryb×Ap总×1.01=0.75×1860×5×140×1.01=986.27KN
N3:δK=0.75Ryb×Ap总×1.01=0.75×1860×5×140×1.01=986.27KN
(1.01为锚板应力损耗系数)

二、张拉程序
             0   →   10%δK   →   20%δK   →   100%δK(持荷2min锚固)
N1:        0   →   78.90KN  →   157.80KN  →   789.01KN(持荷2min锚固)
N2:        0   →   98.63KN  →   197.25KN  →   986.27KN(持荷2min锚固)
N3:        0   →   98.63KN  →   197.25KN  →   986.27KN(持荷2min锚固)

三、油表读数

N1:
1、1#千斤顶   76#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   3.06MPa  →    5.81MPa  →   27.84MPa

2、0266#千斤顶   40387#油表
0   →   78.90KN  →   157.80KN  →   789.01KN
0   →   1.58MPa  →    3.73MPa  →   25.67MPa

N2:
1、1#千斤顶   76#油表
0   →   98.63KN  →   197.25KN  →   986.27KN
0   →   3.75MPa  →   7.19MPa  →  34.73MPa

2、0266#千斤顶   40387#油表
0   →   98.63KN  →   197.25KN  →   986.27KN
0   →  1.97MPa  →    4.92MPa  →   32.52MPa

N3:
1、1#千斤顶   76#油表
0   →   98.63KN  →   197.25KN  →   986.27KN
0   →   3.75MPa  →   7.19MPa  →  34.73MPa

2、2、0266#千斤顶   40387#油表
0   →   98.63KN  →   197.25KN  →   986.27KN
0   →  1.97MPa  →    4.92MPa  →   32.52MPa

G205宁芜公路养护改善工程B2标江宁镇大桥
预应力钢绞线伸长量计算

边跨梁:
N1        X(m)        25.57        含千斤顶工作长度每端0.58m
N2                25.58        
N3                25.40        
N1        θ=L弧/R        0.12218        
N2                0.12218        
N3                0.02443        
N1        KX+μθ        0.0886167        K=0.00251 μ=0.2
N2                0.0886418        
N3                0.0686400        
N1        1-e-(KX+μθ)        0.084803699        
N2                0.084826670        
N3                0.066337262        
N1        1-e-(KX+μθ)KX+μθ        0.956971981        
N2                0.956960148        
N3                0.966451950        
N1        P×[1-e-(KX+μθ)]KX+μθ        747.59        P=781.20KN
N2                934.47        P=976.50KN
N3                943.74        P=976.50KN
N1             Pp×X     As×Ep        17.505        As=140mm2Ep=1.95×105Mpa
N2                17.512        
N3                17.561        


1/1页次 第1页